Motocross season has kept us busy and I did get slightly sidetracked with a 1971 BSA Lightening project.
That is pretty much done and being ridden now so back to the GM3.
I got the front of the GL1100 motor back together with the rebuilt water pump, got the 77 cams and rockers switched over the 1100 motor and was getting to the point where I needed to get the case repaired before I could move forward. That finally happened today.
The old repair from what I thought was someone putting in a starter bolt that was too long. Turns out it was just epoxy filling the hole and the hole was much bigger than I thought.
We had to build the surface up to get the starter mounts to sit flush. Then once we got to clean aluminum there were two big cracks propagating from the hole. Fortunately this was not the first repair my buddy has done.
.
Now that there is new aluminum where the JB weld was and there is actually a threaded hole to mount the starter, I can continue prepping the motor to put in the frame




